Site | Date | Author | Summary |
East End |
(162) 2025-06-11 12:45:00 |
Carlos Wang |
regular data download and maintenance | plants filled in | mothball added in CR10X boxes
|
East End |
(148) 2025-05-28 09:30:00 |
Joe Verfaillie |
Quick stop to swap picam.
|
East End |
(143) 2025-05-23 11:00:00 |
Joe Verfaillie |
Standard data collection, swapped rotating shadow band box/motor, picam still misbehaving - forgot to bring new one
|
East End |
(129) 2025-05-09 12:50:00 |
Joe Verfaillie |
Standard data collection, swapped 7500 for calibration, restarted shadow band motor - for now, set summer hours for 7700 heaters, conductivity sensor was clean, Picam misbehaving - maybe running for now.
|
East End |
(106) 2025-04-16 14:00:00 |
Joe Verfaillie |
Standard field work, cut up old rusted scaffolding, litter laid low, green tules coming up
|
East End |
(83) 2025-03-24 14:35:00 |
Carlos Wang |
Regular data download and site maintenance
|
East End |
(66) 2025-03-07 13:45:00 |
Joe Verfaillie |
Standard data collection, no hand held salinity due to equipment sharing, a bunch of wasps in the data logger box, standing little is pretty flat.
|
East End |
(50) 2025-02-19 11:00:00 |
Daphne Szutu |
Calibrated 7700, started raining, swapped wash reservoir in-line filter,
|
East End |
(30) 2025-01-30 09:30:00 |
Daphne Szutu |
Quick stop to finish troubleshooting and upload new datalogger program
|
East End |
(29) 2025-01-29 15:30:00 |
Robert Shortt |
Water reservoir leaking--temporarily fixed with electrical tape. SWout channel reading consistent zero.
|
East End |
(15) 2025-01-15 14:05:00 |
Daphne Szutu |
Swapped 7500 for calibration, LWin gaps - moved to different mux channel, removed old solar scaffolding from wetland
|
East End |
(2) 2025-01-02 14:07:00 |
Daphne Szutu |
End-of-year data collection, leak in wash reservoir--fixed, a few days of data missing from dark/rainy days, improved met box, dropped HMP solar shield bolts/nuts
|